
With taking place of earthquake in 2002, and destruction of high part of 4 western provinces of the country (Qazvin, Zanjan, Hamadan and Kermanshah), the duty of reconstructing earthquake- stricken regions ceded to the housing faun ration and consequently, support of reconstruction headquarter of housing foundation in the earthquake-s thicken regions to the Saman Mohit company and purchasing and distributing required metals and cements for mentioned headquarters carried out through this unit.
And it could purchase and distribute about 40/000 tons metal points and about 34/000 ton cement.

Fleet of machinery of Samon Mohit Company, with having 330 systems of all kinds of fixed and flexible machinery as a overfull in is active conducting technical and engineering projects. And interims of appropriate compound and collective variety of systems and by using, technical and expert manpower and by having more than 15 years records was able to play an effective role in executive speed trend and tactical qualities of projects as a dynamic unit. And it goes in the direction of company, objectives with the slogan of knowledge and experience (knowledge for dynamism and experience is helper of knowledge).

Business Unit in the beginning of establishment of Saman Mohit Company established as commercial arm of this company in 2002. and it conduct business affairs including supporting activities, buying and selling material, machinery, spare parts, and all issues related to the mentioned affairs.

In the aftermath of terrible earthquake in 2003 in Bam, ceding reconstruction projects to Islamic revolution housing foundation due to success in the previous operation entered Saman Mohit Company as the person in charge of supporting reconstruction headquarters. And from this operation will be prepared and distributed in domestic business about 150/000ton metals, 1/000/000 ton cement, and 100 million compressed brick- like frame, razor and root blocks. In the foreign business, Bam projects placed under the core of 220 million dollar for World Bank Bam earthquake stricken renovation. Purchasing 29 million dollar machinery and 71 million dollar material and 120 million dollars considered for infrastructure projects.

Saman Mohit company has proved its capabilities by potential human resource of more than 600 persons by contract and 700 persons working and receiving wage daily and by using second hand contractors in difference specialized area including civil engineering, mine, industry, mechanic, management, law and etc.

The need to establish foreign business became necessary, when purchasing 33 million dollar machinery (including 200 ten wheels dump truce, 80 six wheel dump truce, 61 heavy tire loader, and also 46 two cabin pickup car) and 40 million dollars material (including 80 percent metal for example iron beam, bar plate, angle, profile and 20 percent cement in pocket and in volume) from world bank ceded to Saman Mohit Company.

With the occurrence of earthquake other regions of Iran and ceding responsibility of supporting certain headquarters of restructuring which are located in the region, to Saman Mohit Company, this unit of supporting activity and service- giving to the reconstructing headquarter ceded in the more diverse dimension and with more variety. And upon the request of Islamic revolution housing foundation, it became as the main successor of reconstructing this regions and announcing stages of preparing metals and cement from Ministry of industries and mines and Ministry of bus niceness to all main factories, preparing about 100/000 ton of all metal and about 230/000 ton cement became possible business management and preparing need of lack became on the agenda of this company through imports form abroad.
آنالیز، طراحی و پیاده سازی: مسعود خندان